Modification of Purifiers’ Room of a Kamsharmax Bulk Carrier

ARGO NAVIS has just finished the study for the re-arrangement of a purifiers’ room of a bulk carrier. The Owner of the vessel was not happy with the “as built” arrangement which was allowing very limited space for maintenance, repairs and cleaning of the purifiers piping system. We have therefore scanned the room and prepared a completely new foundation platform and piping arrangement.

3D laser scanning and 3D design software has been used in order to accomplish this task.

The benefits of the new arrangement were as follows:

a. The pipes will be with adequate distance to each other so as to allow insulation to be applied to each pipe separately.

b. All items will be accessible for operation and maintenance from the new platform / supporting structure with or without opening the hinged top panels as arranged.

c. Cleaning of the under piping area will be easy since crew can pass through.

s
Argo Navis YouTube Channel
Our Video Channel:

Running Projects
Argo Navis Ltd. has been performing engineering studies for one finally selected system per vessel, based on available documentation and onboard survey results. ... more

Argo Navis Ltd. has been performing feasibility studies for retrofitting installation of pre-selected BWTS for various types of vessels and for different Clients worldwide.... more

The project of Panama Canal new locks construction was originally scheduled for completion by October 2014.... more

Subscribe to our Newsletter
  

Argonavis marine Consulting & Engineering
Argo Navis Ltd.
Marine Consulting & Engineering
118B, Agias Eleousis Str.
Marousi , 15125
Tel: +30 210 8056220
Fax:+30 210 8056221
Argo Navis Ltd. ©2019 All Rights Reserved   |   Terms & Conditions   |   Created by embryodesign   |   Powered by teaCMS @ Dangerous Bend