ARGO NAVIS ENGINEERS LTD successfully completed surveying and 3D laser scanning on board MV ZIM CONSTANZA, a 4250 TEU Container Ship.
We attended and performed an on-board inspection of vessel in Piraeus port, Greece in order to investigate the feasibility of installation of ALFA LAVAL PureBallast 3.1 Ballast Water Treatment System.
During the inspection, we have performed 3D laser scanning of Engine Room Floor Area in the vicinity of the two (2) main Ballast pumps, Engine Room 3rd Deck and the Engine Room 2nd Deck.