ARGO NAVIS ENGINEERS LTD. completed a mooring study for a 115K DWT Crude Oil Tanker, so that the vessel may be able to pass the expanded Panama Canal safely.
The following drawings were created for the client:
- Updated mooring arrangement drawing.
- Arrangement drawing for Pilot Shelters on Navigation Deck.
- Mooring fittings reinforcements drawing.
All drawings were approved by DNV GL or the Panama Canal Authority.